This procedure covers How To Test the Relay Board of a Stairmaster Stepmill 7000PT.
The user's right main panel will need to be removed to perform this testing.
Tools:
- You will need a jumper wire to perform the testing covered in this procedure.
Procedure:
- Disconnect power from the machine.
- Disconnect the main cable from the relay board J1 terminal.
- The main cable should remain disconnected for the duration of the relay board tests.
- With the Power ON, place a jumper wire across the GND/BLK and RLY/RED test points. CAUTION: Ensure the jumper wire only makes contact with the designated test points.
- Verify that the Relay LED is lit.
- Remove jumper wire.
- With the Power ON, place jumper wire across the +/WHT and FLD/BRN test points. CAUTION: Ensure the jumper wire only makes contact with the designated test points.
- Verify that the Field LED is lit.
- Remove jumper wire.
- With the Power ON, place jumper wire across the +/WHT, and with the other end touch the ALT/C.
- Verify that the Field LED lights.
- If any of these jumps fail, replace the relay board and/or power supply.
Comments
Please sign in to leave a comment.